This project involved the complete design, supply, installation, and commissioning of a 600 Tons HVAC system for Water Valley Resort in Sharm El Sheikh.
The HVAC system was engineered to meet the cooling demands of a large-scale resort facility, ensuring high levels of comfort, energy efficiency, and reliable operation in a coastal environment. The scope of work included detailed heat load calculations, system selection, ductwork and piping design, installation of HVAC equipment, insulation works, electrical integration, and full testing & commissioning.
All works were executed in accordance with international HVAC standards and best engineering practices, delivering a durable and energy-optimized cooling solution suitable for hospitality and resort applications.
Sharm El Sheikh
600 Tons
CHWS
CONTRACTOR







