Design Build HVAC

GOLD'S GYM PROJECT

HVAC System Design & Installation – 150 Tons Cooling Capacity

This project involved the complete design, supply, installation, and commissioning of a 150 Tons HVAC system, delivering efficient and reliable cooling performance tailored to the client’s requirements.

The scope of work included load calculation, system selection, ductwork design, chilled water and/or DX system installation, piping, insulation, electrical connections, and full system testing. The installed system was engineered to ensure optimal energy efficiency, indoor air quality, and long-term operational reliability.

All works were executed in accordance with international HVAC standards and best engineering practices, ensuring high performance, safety, and sustainability.

LOCATION

Madinaty

COOLING CAPACITY

150 Tons

SYSTEM TYPE

DX

PROJECT TYPE

CONTRACTOR